MaterialsHub
Trims, transitions & details

Skirting & ProfilesImported & distributed

MDF and timber skirting, aluminium trims, transition profiles, shadow gaps and LED profiles for every floor and wall junction.

We supply the trims that close a project: MDF, solid timber and PVC skirting, aluminium and stainless profiles for tile edges and stair nosings, transition strips between different floor finishes, shadow-gap and coving profiles, plus recessed and surface LED profiles. Heights, colours and lengths are selected together with the flooring and paint, so junctions are planned rather than improvised at the end.

Importer & distributorLead time 1–3 wks
Tall white skirting board and slim aluminium profile meeting an oak floor
Skirting & Profiles — Trims, transitions & details
Delivered in
0–3 weeks depending on finish and quantity
You get
Room-by-room schedule with heights, finishes and running metres
Selection basis
Floor build-up, wall finish, door frames and lighting details
We handle
Quantity take-off, colour matching and delivery
◆Apartment and house renovations◆New residential projects◆Offices and workspaces◆Retail and hospitality interiors◆Hotel rooms and corridors◆Apartment and house renovations◆New residential projects◆Offices and workspaces◆Retail and hospitality interiors◆Hotel rooms and corridors◆Apartment and house renovations◆New residential projects◆Offices and workspaces◆Retail and hospitality interiors◆Hotel rooms and corridors
00 / The brief

Junctions are designed or they are improvised — there is no third option.

Where a floor meets a wall, where tile meets wood, where a ceiling meets plaster: each junction needs a profile chosen for the real thicknesses involved. Left to the end, these details get solved with whatever the site has.

Tall white skirting board and slim aluminium profile meeting an oak floor
1–3 wks

Trims are the last five percent of a project and the first thing anyone notices when they are wrong.

We take the trims off the drawings with the flooring and paint specification, match finishes to the ironmongery and calculate running metres including corners and cutting loss.

4
Profile families supplied
1–3 wks
Typical delivery window
8–15 cm
Common skirting heights
1
Take-off for the whole project
01 / Why through us

We import the skirting & profiles ourselves, so you buy at first hand.

Skirting, tile trims, transitions and LED profiles are taken off together, so every junction has an answer before the trades arrive.

01 / 04

Chosen with the floor, not after it

Skirting height and profile depth follow the flooring build-up and door frames, so the detail lines up in every room.

Junction checked against floor build-up

02 / 04

Transitions resolved on the drawing

Changes between tile, wood and vinyl are decided with the right profile and level difference before the trades arrive.

Transition schedule per doorway

03 / 04

Colours matched, not approximated

Primed skirting is painted to the wall colour and aluminium finishes are matched to the ironmongery on the same job.

Finish samples before ordering

04 / 04

Lengths and quantities calculated properly

Runs, corners, cutting loss and delivery lengths are calculated so the site is not short by three metres.

02 / The range

What we carry in skirting & profiles

04 — The rangeLead time 1–3 wks
01

Skirting boards

Primed and finished MDF, solid timber and moisture-resistant PVC in several heights

Indicative supply range
€4–€32 /lin. m
1–3 wks
02

Tile & edge trims

Aluminium, stainless and brass profiles for tile edges, corners and stair nosings

Indicative supply range
€4–€32 /lin. m
1–3 wks
03

Transition & expansion profiles

Level and height-change strips, movement joints and threshold profiles

Indicative supply range
€4–€32 /lin. m
1–3 wks
04

Shadow gaps & LED profiles

Recessed shadow-gap sections, coving and surface or recessed LED profiles with diffusers

Indicative supply range
€4–€32 /lin. m
1–3 wks
03 / Where it goes

The same material, specified differently per space.

Apartments
01

Apartments

Height and profile stay consistent while the floor finish changes, which is what makes a renovation look resolved.

Consistent height throughout
Offices
02

Offices

Aluminium and impact-resistant sections survive trolleys, chairs and cleaning machines better than painted timber.

Impact-resistant sections
Retail and hospitality
03

Retail and hospitality

Brass, black and stainless profiles tie tiling, joinery and ironmongery into one finish palette.

Finish matched across trades
Lighting details
04

Lighting details

Recessed profiles must be planned before boarding, together with strip type and driver access.

Recessed sections planned
Trims, transitions & details

MDFandtimberskirting,aluminiumtrims,transitionprofiles,shadowgapsandLEDprofilesforeveryfloorandwalljunction.

04 / How to specify it

The decisions that decide the result.

01 / 06

Fix the floor build-up first

Skirting height and profile depth depend on the finished floor level and door frames.

02 / 06

Schedule the transitions

List every doorway and change of material with the profile that resolves it.

03 / 06

Choose moisture-resistant sections for wet rooms

PVC, aluminium or tiled skirting avoids swelling in bathrooms and basements.

04 / 06

Match metal finishes deliberately

Trims, handles and taps should share a finish family, confirmed with samples.

05 / 06

Set out LED profiles before boarding

Recessed sections, strip type and driver position have to be coordinated.

06 / 06

Calculate quantities with waste

Corners, cuts and delivery lengths mean the running metre figure is never the raw perimeter.

Common mistakes

Ordering skirting before the floor is chosen

Height and profile depth stop working when the floor build-up changes.

Skipping transition profiles

Exposed edges chip, and level differences become a trip hazard.

Using timber skirting in a bathroom

It swells and lifts at the joints within the first year.

Terms, plainly
Shadow gap
Recessed reveal at a junction that removes the need for a visible trim.
Stair nosing
Profile protecting the front edge of a step and providing slip resistance.
Transition profile
Strip covering the joint between two different floor finishes or levels.
05 / Catalog Materials Snapshot

A snapshot of the skirting & profiles we move most.

Representative selections from the catalog — indicative of what we quote, stock-source and deliver week to week. Ask for the full schedule with formats, finishes and current lead times.

01Skirting & Profiles

Skirting boards

Primed and finished MDF, solid timber and moisture-resistant PVC in several heights

Indicative supply range
€4–€32 /lin. m
02Skirting & Profiles

Tile & edge trims

Aluminium, stainless and brass profiles for tile edges, corners and stair nosings

Indicative supply range
€4–€32 /lin. m
03Skirting & Profiles

Transition & expansion profiles

Level and height-change strips, movement joints and threshold profiles

Indicative supply range
€4–€32 /lin. m
04Skirting & Profiles

Shadow gaps & LED profiles

Recessed shadow-gap sections, coving and surface or recessed LED profiles with diffusers

Indicative supply range
€4–€32 /lin. m
Prefer to give us a call?Call Now +306948408542
06 / The long read

Skirting & Profiles, from first quote
to a finished room.

Skirting, tile trims, transitions and LED profiles are taken off together, so every junction has an answer before the trades arrive. This is the part most suppliers leave out: what we import, how skirting & profiles should be specified before anyone prices it, where projects lose money, and what our 1–3 wks lead time actually covers.

01

What we import, and what lands on site

We supply the trims that close a project: MDF, solid timber and PVC skirting, aluminium and stainless profiles for tile edges and stair nosings, transition strips between different floor finishes, shadow-gap and coving profiles, plus recessed and surface LED profiles. Heights, colours and lengths are selected together with the flooring and paint, so junctions are planned rather than improvised at the end.

Because we buy skirting & profiles directly from the factories, the range you see is the range we can programme — not a catalogue we hope to source later. In practice that means skirting boards, tile & edge trims and transition & expansion profiles, each with its own price band and availability, so a specification can be tuned to a budget instead of abandoned.

Chosen with the floor, not after it: skirting height and profile depth follow the flooring build-up and door frames, so the detail lines up in every room.

Trims are the last five percent of a project and the first thing anyone notices when they are wrong.

Chosen with the floor, not after it

Skirting height and profile depth follow the flooring build-up and door frames, so the detail lines up in every room.

Transitions resolved on the drawing

Changes between tile, wood and vinyl are decided with the right profile and level difference before the trades arrive.

Colours matched, not approximated

Primed skirting is painted to the wall colour and aluminium finishes are matched to the ironmongery on the same job.

Lengths and quantities calculated properly

Runs, corners, cutting loss and delivery lengths are calculated so the site is not short by three metres.

02

How skirting & profiles should be specified before it is priced

Specifying skirting & profiles well comes down to a short list of decisions taken in the right order — fix the floor build-up first, schedule the transitions, choose moisture-resistant sections for wet rooms and match metal finishes deliberately. Taken on paper, these cost nothing. Taken on site, each one is a change order.

We write the specification with you before anything is quoted, so the number you get is for the material that will actually be installed. That means confirmed dimensions and finishes, the right performance class for the space, and quantities that include the waste factor rather than discovering it mid-installation.

The same reference behaves differently depending on where it goes — apartment and house renovations, new residential projects, offices and workspaces, retail and hospitality interiors each carry their own requirements, and we specify against the space rather than against a mood image.

Shadow gap

Recessed reveal at a junction that removes the need for a visible trim.

Stair nosing

Profile protecting the front edge of a step and providing slip resistance.

Transition profile

Strip covering the joint between two different floor finishes or levels.

Primed MDF

Skirting supplied ready for painting, dimensionally stable and straight.

03

Where skirting & profiles projects lose time and money

Almost every delay we are called in to rescue traces back to the same handful of causes: ordering skirting before the floor is chosen, skipping transition profiles, using timber skirting in a bathroom and adding LED profiles after boarding. None of them are exotic, and all of them are avoidable at specification stage.

Ordering skirting before the floor is chosen is the most expensive one, because height and profile depth stop working when the floor build-up changes.

We have supplied skirting & profiles into apartments, offices, retail and hospitality, and the pattern is consistent: the projects that run smoothly are the ones where the material was locked before the trades were booked.

Skipping transition profiles — checked once on paper, never again on site.

Ordering skirting before the floor is chosen

Height and profile depth stop working when the floor build-up changes.

Skipping transition profiles

Exposed edges chip, and level differences become a trip hazard.

Using timber skirting in a bathroom

It swells and lifts at the joints within the first year.

Adding LED profiles after boarding

A recessed detail becomes a surface fixing, which rarely looks like the original intention.

04

Lead times, pricing and what we handle

Standard lead time on skirting & profiles is 1–3 wks from confirmed specification, and that window covers the whole chain — factory programming, consolidation, transport, customs where applicable and delivery to site or to your warehouse. We quote the landed number, not an ex-works price that grows later.

Pricing is per project rather than per line. Because we import directly and consolidate skirting & profiles with the rest of the materials for the same room, you get one quote, one delivery window and one point of contact — and the savings show up on the total, not just on a headline reference.

If you already have drawings, send them and we will come back with a specification and a landed price. If you do not, we will build the specification with you first. Either way, nothing is ordered until the quantities, finishes and dates are agreed in writing.

07 / Questions

Frequently asked

What skirting height suits a modern interior?+

Taller sections, typically 8–15 cm, read as more contemporary and hide services better; the ceiling height, door frames and the flooring thickness decide what is proportionate.

MDF or solid timber skirting?+

Primed MDF is stable, straight and ideal for painted finishes. Solid timber suits stained finishes and matching a wood floor, and it costs more.

Which skirting works in a bathroom or basement?+

Moisture-resistant PVC or aluminium avoids swelling where water is present. Tiled skirting cut from the floor tile is also a durable option.

Do I need a transition profile between two floor finishes?+

Usually yes, where thickness or material changes. It protects the edges and hides the level difference; the profile type depends on how big that difference is.

Can LED profiles be recessed into the plasterboard?+

Yes, with a recessed section planned before the boarding. Strip type, power supply position and diffuser are decided at the same time.

Can profile finishes match door handles and taps?+

In most families, yes — black, brushed brass, chrome and anodised finishes are available, and we confirm with samples before ordering.

Materials from this category are usually specified for interior design projects and office fit-out. If your project needs installation as well as supply, we handle both together.