Void planned before the height is fixed
Ducts, cable trays and light fittings decide the drop; agreeing it early avoids losing headroom twice.
Void checked against services
Plasterboard, acoustic tile, mineral and metal ceiling systems with grids, hangers and lighting coordination.
We supply suspended ceiling systems complete: plasterboard on metal frames, demountable acoustic tiles on exposed or concealed grids, mineral and metal panels, moisture-resistant boards for wet areas, plus the hangers, profiles, access hatches and perimeter details. The ceiling is planned around what sits above it — ducts, cabling, sprinklers — and around the lighting and shadow-gap details that will be cut into it.

Ducts, cable trays, sprinkler pipework and the depth of light fittings set the drop. Agreeing the void late means either losing more headroom than planned or moving services that are already installed.

A ceiling is the lid on every service in the building — plan the void before you promise the height.
We specify the system against the room's use — seamless plasterboard, demountable acoustic tile, metal panel or moisture-resistant board — and supply the framing, hatches and perimeter details in the same schedule.
Boards or tiles, framing, hangers, hatches and perimeter details are quoted together and coordinated with lighting and MEP.
Ducts, cable trays and light fittings decide the drop; agreeing it early avoids losing headroom twice.
Void checked against services
Tile-and-grid systems keep valves, dampers and cabling reachable, with access hatches where plasterboard is continuous.
Access points marked on the plan
Absorption class and any wool backing are specified for how the room is used, not left to whatever tile is available.
Absorption class stated per room
Moisture-resistant and washable systems are specified for bathrooms, kitchens and commercial food areas.
Board type matched to the room
Standard, moisture-resistant and fire-rated boards with metal framing and accessories
Mineral fibre and gypsum tiles on exposed or concealed grids, in several absorption classes
Perforated metal panels, baffles and linear systems for commercial and technical spaces
Hangers, profiles, access hatches, perimeter trims and shadow-gap sections

Demountable systems keep services reachable while absorbing the noise of an open floor plate.

Coves, shadow gaps and spot positions are set out before boarding so the detail reads as architecture.

Baffles, linear panels and perforated metal control both the sound and the character of the space.

Bathrooms, kitchens and food areas need moisture-resistant or washable systems with planned inspection points.
Plasterboard,acoustictile,mineralandmetalceilingsystemswithgrids,hangersandlightingcoordination.
Duct depths and tray routes set the minimum void before any height is promised.
Valves, dampers and junctions need hatches or a demountable system above them.
Meeting rooms, open floors and restaurants each need a different absorption class.
Fitting depth, cove sections and driver positions all affect the framing.
Moisture-resistant and fire-rated boards belong where the room and regulations require them.
Hangers, perimeter trims and hatches are part of the cost, not an afterthought.
Services then have to be rerouted or the room loses more height than agreed.
The first maintenance visit turns into cutting open a finished ceiling.
Absorption and humidity performance vary widely between visually similar tiles.
Representative selections from the catalog — indicative of what we quote, stock-source and deliver week to week. Ask for the full schedule with formats, finishes and current lead times.
Standard, moisture-resistant and fire-rated boards with metal framing and accessories
Mineral fibre and gypsum tiles on exposed or concealed grids, in several absorption classes
Perforated metal panels, baffles and linear systems for commercial and technical spaces
Hangers, profiles, access hatches, perimeter trims and shadow-gap sections
Boards or tiles, framing, hangers, hatches and perimeter details are quoted together and coordinated with lighting and MEP. This is the part most suppliers leave out: what we import, how suspended ceilings should be specified before anyone prices it, where projects lose money, and what our 1–4 wks lead time actually covers.
We supply suspended ceiling systems complete: plasterboard on metal frames, demountable acoustic tiles on exposed or concealed grids, mineral and metal panels, moisture-resistant boards for wet areas, plus the hangers, profiles, access hatches and perimeter details. The ceiling is planned around what sits above it — ducts, cabling, sprinklers — and around the lighting and shadow-gap details that will be cut into it.
Because we buy suspended ceilings directly from the factories, the range you see is the range we can programme — not a catalogue we hope to source later. In practice that means plasterboard ceilings, acoustic tiles & grids and metal & linear ceilings, each with its own price band and availability, so a specification can be tuned to a budget instead of abandoned.
Void planned before the height is fixed: ducts, cable trays and light fittings decide the drop; agreeing it early avoids losing headroom twice.
A ceiling is the lid on every service in the building — plan the void before you promise the height.
Ducts, cable trays and light fittings decide the drop; agreeing it early avoids losing headroom twice.
Tile-and-grid systems keep valves, dampers and cabling reachable, with access hatches where plasterboard is continuous.
Absorption class and any wool backing are specified for how the room is used, not left to whatever tile is available.
Moisture-resistant and washable systems are specified for bathrooms, kitchens and commercial food areas.
Specifying suspended ceilings well comes down to a short list of decisions taken in the right order — survey the services first, decide where access is required, set the acoustic target per room and coordinate lighting before boarding. Taken on paper, these cost nothing. Taken on site, each one is a change order.
We write the specification with you before anything is quoted, so the number you get is for the material that will actually be installed. That means confirmed dimensions and finishes, the right performance class for the space, and quantities that include the waste factor rather than discovering it mid-installation.
The same reference behaves differently depending on where it goes — offices and meeting rooms, apartments and houses, retail and showrooms, hotels and restaurants each carry their own requirements, and we specify against the space rather than against a mood image.
Space between the structural slab and the finished ceiling, occupied by services.
Suspension system hidden above the tiles for a flush appearance.
Openable panel giving maintenance access through a continuous ceiling.
Vertical fins suspended below the slab, absorbing sound while leaving services visible.
Almost every delay we are called in to rescue traces back to the same handful of causes: fixing the ceiling height before surveying the void, boarding over valves and dampers, choosing tiles on price alone, leaving cove details to the installer. None of them are exotic, and all of them are avoidable at specification stage.
Fixing the ceiling height before surveying the void is the most expensive one, because services then have to be rerouted or the room loses more height than agreed.
We have supplied suspended ceilings into offices, homes, retail and hospitality, and the pattern is consistent: the projects that run smoothly are the ones where the material was locked before the trades were booked.
Boarding over valves and dampers — checked once on paper, never again on site.
Services then have to be rerouted or the room loses more height than agreed.
The first maintenance visit turns into cutting open a finished ceiling.
Absorption and humidity performance vary widely between visually similar tiles.
Lighting coves improvised on site rarely align with the room's geometry.
Standard lead time on suspended ceilings is 1–4 wks from confirmed specification, and that window covers the whole chain — factory programming, consolidation, transport, customs where applicable and delivery to site or to your warehouse. We quote the landed number, not an ex-works price that grows later.
Pricing is per project rather than per line. Because we import directly and consolidate suspended ceilings with the rest of the materials for the same room, you get one quote, one delivery window and one point of contact — and the savings show up on the total, not just on a headline reference.
If you already have drawings, send them and we will come back with a specification and a landed price. If you do not, we will build the specification with you first. Either way, nothing is ordered until the quantities, finishes and dates are agreed in writing.
Typically 8–30 cm, driven by the services above and the depth of the light fittings. It is worth agreeing the figure before the electrical layout is finalised.
Plasterboard gives a seamless finish and better detailing; tile-and-grid keeps the void accessible and is faster to modify. Many projects use both, room by room.
Absorbing tiles and wool backing reduce reverberation inside the room noticeably. Stopping noise between floors is a separate build-up.
Moisture-resistant plasterboard or a washable panel system, with ventilation and any inspection hatch planned in the same layout.
Yes. Recessed profiles and coves need to be set out before boarding, together with the fitting positions and driver access.
Yes. Hangers, profiles, hatches, perimeter trims and fixings come in the same schedule as the boards or tiles.
Materials from this category are usually specified for office fit-out and retail fit-out. If your project needs installation as well as supply, we handle both together.